Browse all practice questions for the Rigger Basic ADC Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Rigger Basic ADC Practice Test course image
More practice questions

These questions are part of the practice quiz. Start practicing

  • Which statement correctly defines safety factor and safety margin and describes their influence on the lifting plan?
  • When should identified 'hazard controls' be implemented?
  • Which element is least likely to be addressed by a pre-lift hazard mitigation plan?
  • When damaged equipment is identified, which action should be taken first?
  • When installing structural steel, what is a 'podger' used for?
  • What are the safe signaling procedures during a lift?
  • Which material has density 2400 kg per cubic meter as listed in calculations?
  • Which statement best describes the relationship between hazard and risk?
  • Explain the concept of center of gravity in lifting.
  • Which of the following would be considered a defect that renders a sheave block unfit for use?
  • Which document should guide the operation team on outriggers extension and locking?
  • If a rigging component is missing or has illegible markings and the WLL cannot be verified, what is the correct course of action?
  • What is the first step if a load starts to swing?
  • Which factors are evaluated to determine a crane's suitability for a specific lift?
  • Which factors determine how many legs are needed for a lift?
  • NOT listed as a pre-use check for a lifting clutch?
  • Define Working Load Limit (WLL) and explain how it relates to a rigging job.
  • How should damaged hardware be handled after a lift?
  • What should be checked for a permanent anchor beyond physical condition?
  • How is safe working radius determined for a lifting device?
  • What are common defects found in wire rope used for lifting?
  • Which distance from a transmission tower requires an ESV spotter?
  • During a pre-lift briefing, which action should occur?
  • When using an eye bolt, what kind of lift is it appropriate for?
  • Who could provide a rigger with the minimum forces required for static line anchor points?
  • The lift plan or panel erection plan is used to specify what?
  • What should a Rigger do first if an unsafe situation occurs during work operations?
  • Dynamic forces are described as?
  • Which of the following is an example of height safety equipment (beyond basic PPE) that a rigger can use when working at heights?
  • What is the difference between a hook with a latch and a hook without?
  • What defines a permanent anchor and how is its integrity checked?
  • Which item is a main consideration to be taken when planning Rigging tasks?
  • Which item is NOT among the tools or rigging devices that can be used to level a structural steel column?
  • Which defect would indicate a safety net is unfit for operation due to UV exposure?
  • How can sling material choice be affected by chemical exposure?
  • How would a rigger determine the lifting method for equipment attached to precast panels?
  • To stop a steel beam from rolling during construction, what bolt process can be followed?
  • Which action could cause damage to a shackle during the lifting process?
  • How should WLL per leg change as a sling forms a larger angle with the vertical?
  • What determines how far out from a building a cantilevered crane loading platform (CCLP) can extend?
  • What are the primary purposes of tag lines when controlling long or heavy loads?
  • What qualification is required of a spotter working with electrical exclusion zones?
  • What is the purpose of an ESV spotter in relation to exclusion zones?
  • Which of the following is NOT listed as a document that can provide workplace safety information?
  • What does WLL stand for in rigging gear specifications?
  • The remote release device is used to perform which action?
  • Which mark identifies a high strength structural nut?
  • A 2,000 lb load is lifted with a two-leg sling, each leg at 45 degrees from vertical. If each leg's WLL is 1,400 lb, is the lift within safe limits?
  • Which document should a rigger consult to confirm the proper extension and locking method for outriggers on a mast climbing work platform?
  • What must be in place prior to work commencing when plant is erected over a pedestrian footpath?
  • Why is it important to ensure compatibility between lifting clutch WLL and lifting insert WLL?
  • If the load is not centered, what is the risk?
  • What distance from a power pole requires an ESV spotter?
  • For official extension and locking instructions of outriggers on a mast climbing work platform, consult:
  • What are signs of overheating in chain slings?
  • How does increasing the angle between two legs of a two-leg sling affect the load carried by each leg?
  • List key inspection steps for a metal chain sling before use.
  • After installation, what must be done with the tensioning device of a static line?
  • What damage can be caused to FSWR when loaded through a sheave block with a groove diameter that is TOO LARGE?
  • How can you verify balance of a suspended load during the initial lift?
  • Which mark identifies a high strength structural washer?
  • What is the distance from a transmission tower that requires an ESV spotter?
  • Which of the following is NOT listed as a common workplace hazard?
  • When tying a mast climbing work platform to a nearby structure, which orientation is recommended?
  • If the groove diameter is too small, what happens to FSWR under load?
  • Which defect would render synthetic slings unfit for use?
  • Open-end or ring spanners are preferred over adjustable spanners because:
  • What must an employer provide before assigning a rigger unfamiliar or uncommon tasks?
  • Which of the following is a defect that would render a chain sling unfit for use?
  • What damage can be caused to FSWR when loaded through a sheave block with a groove diameter that is TOO SMALL?
  • Which of the following is NOT listed as a defect that would render a safety net unfit for operation?
  • Which item is a main planning consideration for rigging tasks?
  • Before erecting a mast climbing work platform, which document should you consult to ensure structural capacity?
  • During a lift, if wind gusts exceed the defined safety limit, what action should be taken?
  • What is the density per cubic meter used for water in these calculations?
  • What is the commonly recommended maximum sling angle from vertical for a two-leg sling to maintain capacity?
  • The procedure for outriggers extension and locking is documented in the...
  • Prior to erection, what type of guys would be used to support or stabilise a vertical structure?
  • Why is an open framed turnbuckle used when tensioning static lines?
  • When is using 'fall arrest' as a height safety measure an acceptable risk control?
  • What is a 'tag line' and why is it used?
  • Before using a chain sling, which item is essential to inspect for damage?
  • The possibility or likelihood of being injured by a hazard is defined by its level of what?
  • A rigger should rely on which document for the specific steps to extend and lock outriggers?
  • Which distance from a power pole is the non-ESV exclusion distance?
  • Which of the following is a defect that would render a shackle unfit for use?
  • If you need the precise extension sequence for outriggers, you should consult the...
  • Which statement correctly states the mandated exclusion zones around power poles and transmission towers?
  • Where can you verify the working load limit for a CCLP?
  • What is the proper documentation action after removing a component from service?
  • Why is it unacceptable to use a 5 tonne WLL lifting clutch on a 2.5 Tonne WLL lifting insert?
  • Why should FSWR not be used in a sheave block designed for fibre rope?
  • What are common signs of wear or damage you should look for on fiber slings?
  • Which defect would render synthetic slings unfit for use?
  • Why is compatibility between rigging components important?
  • What zones should be established to protect personnel during a lift?
  • What is a primary purpose of a rigging plan during a lifting operation?
  • When working at heights, why are open end or ring spanners the preferred option over adjustable shifting spanners?
  • What rigging qualification is required for installing precast panels?
  • Which entity is typically responsible for obtaining the Manufacturer's Specifications for precast lifting?
  • Which material is listed with a density of 2400 kg per cubic meter?
  • Which of the following is the authoritative source for outriggers extension and locking procedures on a mast climbing work platform?
  • What is the role of a qualified person in rigging operations?
  • Explain the steps for performing a pre-lift briefing with the crew.
  • How should a non-personnel safety net be installed?
  • Where should the load's center of gravity be in relation to the lifting point?
  • What is the minimum groove depth requirement for FSWR blocks relative to rope diameter?
  • What term describes the restricted area around electrical hazards where special controls apply?
  • Which of the following could provide site specific safety information on a worksite?
  • Lifting clutches are to be proof tested how often?
  • Which defect would render FSWR slings unfit for use?
  • How should rigging hardware be stored to prevent damage?
  • Which of the following is an example of height safety equipment other than basic PPE a rigger can use when working at heights?
  • Other than using an Elevated Work Platform (EWP), what device can assist a rigger in removing lifting clutches without climbing at height?
  • At what times should PPE (including fall arrest equipment) be inspected for suitability and condition?
  • What risk control measure can a rigger use to prevent falling from height when preparing to relocate a CCLP from one floor to the next?
  • Who could provide ground condition information?
  • When lifting an irregularly shaped load, which precautions are recommended?
  • When checking outriggers for a mast climbing platform, you should refer to the...
  • The definitive source for outriggers extension and locking procedures is the...
  • What are the rules for loading orientation and pin retention on a fixed hook?
  • How should near-miss reports for rigging be documented?
  • In planning a lift, which document most precisely outlines how outriggers must be extended and secured?
  • Why are packers used when installing columns to plinths or pedestals?
  • Which statement correctly describes an acceptable condition for fixing FSWR onto a winch drum?
  • Why is overhead clearance important in preventing shock loading?
  • Which steps are involved in verifying new rigging gear before first use?
  • Why is it important to verify that rigging gear markings match project requirements?
  • How does a rigger identify how much weight can be placed on a canter levered crane platform (CCLP)?
  • Who is responsible for determining lifting points on precast components?
  • Provide a description of how to identify the following: High strength structural bolt; High strength structural nut; High strength structural washer.
  • What are the consequences of incompatible rigging components?
  • What is the density per cubic meter used for steel?
  • What should you do if a load starts to swing uncontrollably?
  • Two pieces of information that must be permanently displayed on a lifting clutch.
  • Which groove depth is acceptable for FSWR?
  • Which items should be evaluated for environmental hazards before a lift?
  • What is the purpose of tag lines during a lift?
  • Identify a primary type of rigging hardware used to connect rigging to loads.
  • What action is one of the immediate responses to an unsafe situation?
  • Which defect would render FSWR slings unfit for use?
  • Fitting bolts through the supporting structure to a cantilevered crane platform (CCLP) is used to prevent which movement?
  • When lifting an irregular load, why should load contact areas be stable?
  • What source contains the authoritative method for extending and locking outriggers on a mast climbing work platform?
  • Which defect would render synthetic slings unfit for use?
  • What is the difference between a straight hitch and a choke hitch in a sling and how does it affect load distribution?
  • Why should only high strength structural bolts be used during steel erection?
  • When damaged equipment is identified, which action should be taken as the second step?
  • What does FSWR stand for?
  • What action supports keeping personnel safe with regard to the load path during rigging operations?
  • Prior to wind bracing being fitted, what must be done to support the first roof truss when erecting a structure?
  • Which statement best describes the role of signals during a lift?
  • Before erecting a mast climbing work platform on a suspended concrete slab, what document should be referred to and why?
  • Which of the following is the correct angle for a portable ladder to be installed?
  • Why is determining the load's center of gravity important in rigging?
  • Which distance from a transmission tower is the non-ESV exclusion distance?
  • When 'dragging' or 'skidding' a load horizontally, why is it preferred to use a come-along rather than a chain block?
  • Which of the following is a defect that would render a safety net unfit for installation?
  • If the groove diameter is too large, what happens to FSWR under load?
  • What is the density per cubic meter used for concrete?
  • When erecting a mast climbing work platform that needs to be tied in to the nearby structure, should it be erected 'mast-in' or 'mast-out'?
  • How should weather conditions influence rigging operations?
  • Why is it dangerous to stand under a suspended load?
  • Wind loads are described as?
  • What would define a hazard?
  • Which of the following is NOT listed as a task that requires a Qualified Basic Rigger?
  • Which of the following is an obligation an employer must meet with regards to workers safety?
  • What is the purpose of confirming ground conditions and stability when performing rigging tasks?
  • Which defect would render FSWR slings unfit for use?
  • What rigging qualification is required for tilt-up installation?
  • Which defect would render FSWR slings unfit for use?
  • The explicit extension and locking method for outriggers is defined in the...
  • What is the purpose of outlining a load path in a rigging plan?
  • Which statement about working load limit (WLL) is true?
  • Which of the following is one of the common workplace hazards listed?
  • During lift planning, what should be considered beyond the static load to ensure safety?
  • Which person on a worksite could provide site-specific safety information?
  • Differentiate static lifting from dynamic lifting.
  • A safety net is considered a second order measure for height safety risk control.
  • In rigging, what does deflection refer to?
  • List 2 hazards associated with attempting to remove a steel beam from a tight position and no movement occurs.
  • Which statement accurately describes where each is manufactured?
  • What is shock loading and how can it be prevented?
  • When is a safety net used as a second order measure for height safety risk control?
  • Why might spreaders be used when lifting an irregularly shaped load?
  • Where could a rigger find information on lifting angles required between lifting inserts on precast panels?
  • When a load is supported by a winch, how many turns of rope must remain on the winch drum at all times?
  • To ensure proper outriggers use on a mast climbing platform, consult the...
  • What is the purpose of a 'rated capacity' label on rigging hardware?
  • Which of the following is an acceptable control measure to protect pedestrians or other workers from vehicles and mobile plant?
  • Where would a rigger find information on how outriggers of a mast climbing work platform are to be extended and locked?
  • The extension and locking procedure for outriggers is defined in what form of documentation?
  • How do you determine the number of legs required for a lift?
  • What should be done with damaged gear after removal from service?
  • What is the consequence of not aligning the CG with the lifting point?
  • What is the load path in rigging and why is it critical?
  • If the sling angle from vertical exceeds the commonly recommended maximum, what should you do to maintain safety?
  • What are the guidelines for using an eye bolt in lifting?
  • Height safety measures become a requirement at what height?
  • Which defect would render synthetic slings unfit for use?
  • Which of the following is a defect that would render a safety harness and lanyard unfit for use?
  • Before landing loads in a fixed CCLP, which item is NOT among the listed checks?
  • If there are gaps between the CCLP and the supporting floor, what should be done?
Subscribe

Get the latest from Passetra

You can unsubscribe at any time. Read our privacy policy